Broughty Ferry Town Flood Protection, Dundee

The scheme is designed to reduce the risk of flooding to residential, open space, community and businesses within Broughty Ferry. The project required measurement of a new surface water drainage system to remove surface water from the existing combined sewer system, surface water from the carriageway, footways and other hard standings. New discharge elements through the new sea wall. Carriageway and Footway improvement works, to include both a new 4m and in places 5m wide promenade combined footway/cycleway. The works were required to be measured in line with HMMW.